Corridor K‐8

Corridor K‐8, part: KichevoTrebenishta, Viaducts and Bridges

This is one of the biggest projects that is currently under construction in R. Macedonia. It is a new modern highway  from town Kichevo to village Trebenishta (near Ohrid).

Design details
Total Length > 2,000.00 m
Number of bridges Over 20
Location R. Macedonia
Structure category I (according Macedonian Law on construction)
Year of the design Ongoing (Under construction)
Structure Bridges and Viaducts with different length: 110m; 150m; 220m; 350m


Superstructure: Precast prestressed concrete I‐girders

Substructure: Reinforced concrete piers with rectangular section and Reinforced concrete abutments

Activities performed: Design stages: preliminary, detailed design ‐ structural analysis, formworks and reinforcement details
Function Highway Infrastructure
Activities performed
structuraldesign
Structural Design